1. Overall Objective Break the whole production-like system on purpose and prove it recovers correctly.

2. The Problem We Are Solving Component tests miss interactions between components: client retries racing ledger restarts, workers resuming after failover, and backlogs after outages.

3. Concepts and Research

  • Game day planning.
  • Blast radius.
  • Steady-state hypothesis.
  • Failure catalogue: DB failover, disk full, network partition between the client and the ledger, clock skew, worker crash, a mass offline sync burst (e.g. after a regional network outage).

4. Implementation Tasks

  • Write the game-day plan.
  • Run each failure in staging under production-shaped load.
  • Record detection time, recovery time and the result of the integrity checks.
  • Write follow-up issues.

5. Testing Requirements For every failure:

  • verify is clean
  • no acknowledged request is lost
  • no duplicates
  • the alert fired
  • the runbook worked

Mass sync burst: 100k receipts in 10 minutes ingest correctly within the target.

6. Deliverables Game-day report.

7. Acceptance Criteria All failures recovered with clean verification, and all follow-ups fixed or explicitly accepted.

8. Dependencies Steps 3.09–3.16.

9. Estimated Difficulty High.

10. Exit Gate No open critical follow-ups.